Mini Cart

  • No products in the cart.

V-Neck Mint Sequin Mermaid Long Prom Dress with Slit

$149.00

Description

Shimmer with confidence in this mint sequin prom dress. a dazzling statement of glamour and poise. The sleek mermaid silhouette hugs every curve. while the plunging V-neckline and delicate spaghetti straps create a soft yet striking allure. A thigh-high slit adds a flirty edge. giving the gown fluid movement and red-carpet appeal. Finished with a radiant all-over sequin design. this dress ensures you sparkle from every angle — perfect for prom. evening galas. or any night meant to shine.

  • Silhouette: Mermaid
  • Neckline: V-Neck
  • Straps & Sleeves: Spaghetti Straps
  • Back Style: Low Scoop Back
  • Embellishment: All-Over Sequins
  • Fabric: Stretch Sequin Mesh
  • Length: Floor-Length with Slit
  • Built-In Bra: Yes
  • Boning: Yes
  • Features: Curve-Enhancing Fit. Side Slit. Dazzling Sequin Finish

Color Chart

prom dresses color chart | CathyProm

Color Chart

Size Chart

care-icon

Size Chart

Shipping

1.Shipping Methods We Offer:


DHL,TNT, UPS, Fedex etc.

All dresses will be shipped via express. Normally you will receive your order in 3-7 days after it was shipped.

We ship to all over the world. If you can not find your country when check out, please contact us.

2.Delivery Time.

Delivery Time = Processing Time + Shipping Time

Free shipping, you will receive the dress in 25-35 days after payment.

Standard delivery, you will receive the dress in 20-25 days after payment.

Rush delivery, you will receive it in 15-20 days after payment.
If you need the dress urgently. Please note us the date you need the dress, we will put your order on prior schedule and make sure you receive it on time.
For some styles with complicate beading and hand work, it may take few more days for processing.

3.Shipping Fee

The shipping fee is automatically calculated based on the weight of the dresses. However, you can choose free shipping in the shipping options, and the free shipping order will be received between 25-35 days.