Mini Cart

  • No products in the cart.

Evangeline | Teal Strapless Lace-Up Ruched Mermaid Long Formal Dress with Slit

$189.00

Description

Exude elegance and poise in the captivating Evangeline teal formal dress. Featuring a strapless design and a charming lace-up back. this gown brings a romantic flair to your ensemble. A stylish choice suitable for both evening dresses and formal dresses. with its mermaid silhouette. adorned with a side slit. introduces an element of glamour that effortlessly enhances your figure. Ruching details add depth and sophistication. ensuring you make a memorable impression. Embrace your individuality in this exceptional dress. perfect for any formal occasion!

Details:

  • Silhouette: Mermaid Style
  • Fabric: Satin Fabric
  • Color: Available in Teal. Red Color
  • Length: Sweep Train
  • Neckline: Square Neckline
  • Sleeves: Sleeveless
  • Back: Lace-up Back
  • Embellishment: Slit

Color Chart

prom dresses color chart | CathyProm

Color Chart

Size Chart

care-icon

Size Chart

Shipping

1.Shipping Methods We Offer:


DHL,TNT, UPS, Fedex etc.

All dresses will be shipped via express. Normally you will receive your order in 3-7 days after it was shipped.

We ship to all over the world. If you can not find your country when check out, please contact us.

2.Delivery Time.

Delivery Time = Processing Time + Shipping Time

Free shipping, you will receive the dress in 25-35 days after payment.

Standard delivery, you will receive the dress in 20-25 days after payment.

Rush delivery, you will receive it in 15-20 days after payment.
If you need the dress urgently. Please note us the date you need the dress, we will put your order on prior schedule and make sure you receive it on time.
For some styles with complicate beading and hand work, it may take few more days for processing.

3.Shipping Fee

The shipping fee is automatically calculated based on the weight of the dresses. However, you can choose free shipping in the shipping options, and the free shipping order will be received between 25-35 days.